homepage
Skip to page body Home About Round Rock What's New City Services Library Parks & Recreation Departments
spacer
Round Rock, Texas - Purpose. Passion. Prosperity.
spacer
  Click here to start search.
spacer
Calendar
Capital Improvement Program
City Focus video newsmagazine
City News
Emergency Management
eSubscription
Most Visited Pages
Online Survey
Public Notices
Upcoming Events
Community Links
spacer
 IH 35 Ramp Reversals between U.S. 79 and FM 3406
Print

Description: This project includes the reversals of the entrance and exit ramps on IH-35 and the addition of an auxiliary lane on the frontage road between FM 3406 and U.S. 79. This work will have many benefits: significantly improve access to the numerous commercial properties along the frontage road; reduce congestion at the intersections by allowing traffic to by-pass the intersection via the interstate main-lanes; and eliminate a bottleneck on the IH-35 northbound main lanes at US79.

Budget: $8.5 million

Project Manager:  Leah Collier - (512) 341-3318

Project Timeline:

  • Engineering and Design - March 2012-June 2014
  • TxDOT Bid - August 2014
  • TxDOT Construction - October 2014-October 2015

Project Status: 100% Plans are complete; TxDOT bid August 2014 

Engineer: CP&Y

Construction Contractor: To Be Determined

Project Schematic: Download PDF of Map

Project Map:


View IH 35 Ramp Reversals between US 79 and FM 3406 in a larger map



Some files require a special viewer - Use the list below to locate the proper program based on file-type:
PDF Adobe Reader ZIP WinZip DOC Word XLS Excel PPT PowerPoint WMV Windows Media

spacer
spacer
City of Round Rock | 221 East Main Street, Round Rock, Texas 78664 | Phone: (512) 218-5400
©2014 City of Round Rock. All Rights Reserved. | Customer Survey | Site Map | About this website