homepage
Skip to page body Home About Round Rock What's New City Services Library Parks & Recreation Departments
spacer
Round Rock, Texas - Purpose. Passion. Prosperity.
spacer
  Click here to start search.
spacer
Calendar
Capital Improvement Program
City Focus video newsmagazine
City News
Emergency Management
eSubscription
Most Visited Pages
Online Survey
Public Notices
Upcoming Events
Community Links
spacer
 Onion Branch Bank Stabilization
Print

Project IDDR02ONI
Project NameOnion Branch Bank Stabilizaton
Description

The Onion Branch Bank Stabilization Project extends from U.S. Highway 79 to near the confluence with Brushy Creek and has experienced some severe erosion problems due to increased flows in recent years.  The existing conditions of the banks have eroded to the point of placing the City's existing water, wastewater and stormwater infrastructure in jeopardy.  This project will consist of protecting the banks with the construction of mechanically-stablilized earth (MSE) walls, protecting the water and wastewater lines with grade-control structures constructed from large diameter rock, extending existing stormwater lines, and revegetating the banks with more drought tolerant vegetation.

Budget$757,000
Project ManagerLance Shellenberger
218-6609
Project Timeline
 Project Phase  Estimated Completion
 
Design March 2012
Construction October 2012
Project StatusOn Time
Architect
EngineerURS Corporation
Construction ContractorAustin Filter Systems
Public Meetings
Project Maps

spacer
spacer
City of Round Rock | 221 East Main Street, Round Rock, Texas 78664 | Phone: (512) 218-5400
©2014 City of Round Rock. All Rights Reserved. | Customer Survey | Site Map | About this website