The Clay Madsen Recreation Center is getting a much needed face lift and various areas may be closed or inaccessible through June 3 during the remodel process. We apologize for any inconvenience this may cause. | Download flier (PDF)
The Rec Center will be closed May 21-30 for the remodeling. The rest of the time the Center will be open but certain areas will be closed. See schedule below.
Current members will receive membership extensions. Additionally, regular instructional-based programming will be moved to alternate locations during the remodel process.
Here is what we are doing to your recreation center to make it better for you:
- Resurfacing the racquetball court floors
- Resurfacing the basketball court floors
- All hallway floors will be refurbished with a more durable product
- General cleaning and maintenance of all hallways and floors including texturing and repainting of walls
Remodel Schedule
- April 22 – 24 -- Rec Center closed
- April 25 – 29 -- Racquetball courts closed
- May 21 – 30 -- Rec Center closed
- May 31 – June 3 -- Basketball Courts closed
Please be patient as we make Clay Madsen Recreation Center an even better place to recreate! If you have any questions about the remodel process, please call CMRC at 218-3220.