The City of Round Rock is developing a master plan for downtown, and this is the fifth and final work session of the week-long charrette on the plan.
During this session, the design team finalizes the draft master plan(s) on Friday and prepares conceptual illustrations and diagrams to convey the master plan concepts to the community, based on all the feedback and input received over the week. Members of the community are welcome to talk with the team and check out the drawings although no individual meetings are scheduled because of the intensity of the Friday design session.