University Boulevard Widening

Description
Reconstruction of University Blvd, between N. IH 35 frontage road to Sunrise Boulevard, to a six-lane, median divided urban arterial.  Dual turn lanes will be added at the intersections of Oakmont and University Oaks.  Utility relocations are also a part of this project and will begin after right-of-way is acquired.  Right-of-way is currently being acquired. Construction is anticipated to begin 2018.

Project Phase and Status

The roadway design plans are currently 100 percent complete. This project is currently in the right of way acquisition phase and is expected to be completed by summer of 2018. Approximately 90% of the necessary right of way has been acquired and utility relocation design is ongoing.  The actual utility relocation will begin when the right of way acquisition has been completed.  The limits of this project are from University Oaks Blvd. to just east of Sunrise Road to include a left turn lane.

Click image to enlarge

Click image to enlarge

 

 

 

 

 

 

 

Engineer
Kennedy Consulting

Construction Contractor
To be determined

Budget
To be determined, Williamson County is participating in the cost

Project Manager
Bill Stablein (512) 218-3237