2019 Arterial Street Maintenance Program – Old Settlers Blvd, Sunrise Road, University Blvd, Red Bud Lane


As part of the City’s ongoing Street Maintenance Program, these areas will receive a long lasting and durable driving surface, including a pavement seal, which protects and revitalizes the pavement surface on specific arterial streets Old Settlers Boulevard, Sunrise Road, University Boulevard, and Red Bud Lane. The project also includes other improvements: curb, curb ramp, gutter, sidewalk, pavement repairs and pavement milling.

The City of Round Rock manages more than 1,150 lane miles of roadways within its jurisdiction. In order to preserve, and/or improve, the conditions of existing roadways, the City has developed a Street Maintenance Program. This program allows the City to monitor the state of its roadways and systematically repair, and/or overlay our city streets.

STATUS:

Construction

TYPE:

Street Maintenance

ENGINEER:

City of Round Rock

CONTRACTOR:

Texas Materials

PROJECT MANAGER:

Jose (JC) Montelongo, Project Manager

512-218-7026

jmontelongo@roundrocktexas.gov

Contact Us