Red Bud Lane South-Evergreen Drive to Gattis School Road


This project upgrades an existing 2-lane roadway to a new 5 lane divided arterial roadway with continuous left turn lane. Design should be completed in 2021 with construction to begin in 2023.

The public meeting originally scheduled for April 16, 2020 was rescheduled for July 28, 2020.

 

STATUS:

Design

TYPE:

Transportation

ENGINEER:

LJA Engineering

PROJECT MANAGER:

Dawn Scheel, Project Manager

512-218-6603