Red Bud Lane South-Evergreen Drive to Gattis School Road

This project upgrades an existing 2-lane roadway to a new 5 lane divided arterial roadway with continuous left turn lane. Design should be completed in 2023 with construction to begin in 2024.

The City held public meeting on July 28, 2020 to share the preliminary design plans and hear feedback from the community. The materials shared at the public meeting and the meeting report including responses to public comment are available below. To view the preliminary schematic please click the “view project map” at the top of the page.

Utility relocation and Right-of-Way (ROW) must be completed before construction on the project can begin. Bid/construction anticipated for 2025.