Gattis School Road Segments 4 & 5

This expansion project of Gattis School Road will provide the 6-lane divided upgrade to the existing 4-lane facility as called for in the City’s Transportation Master Plan. This project specifically consists of two segments of Gattis School Rd that are known as Segment 4 & Segment 5. The limits of each segment are defined as Seg. 4 being approximately 0.59 miles East of Double Creek Drive to Kenney Fort Blvd and Seg. 5 from 0.27 miles East of Kenney Fort Blvd to Via Sonoma Trail. Proposed improvements for Segments 4 and 5 include: widening the existing four-lane roadway to a six-lane major divided arterial with raised medians, pedestrian improvements, and traffic signals at Round Rock Ranch Blvd (west) and Round Rock Ranch Blvd (east) / Meister Lane.

 

The preliminary engineering work began in November 2023 and the construction phase is anticipated to begin in FY 2025 as soon as impacted private utilities have been relocated. A project layout will be added to this webpage as soon as that document is available.

View Project Map (PDF)
All Gattis School Road Segments Map (PDF)

Schematic

Preliminary Design
Transportation
JMT
Greg Ciaccio
512.218.7017
gciaccio@roundrocktexas.gov
Scroll to Top