The City of Round Rock provides a subdivision improvement permit application packet (pdf) that provides the procedural information, checklists and forms necessary for obtaining subdivision plan approval and permit through the Planning and Development Services Department (PDS).
The applicant is responsible for extending subdivision improvements (streets, water, wastewater and drainage) to each lot. The plan review, construction inspection, and fiscal posting process are coordinated through the Project Closeout Coordinator.
To post fiscal to guarantee construction of subdivision improvements instead of constructing them prior to recordation, contact Hazel Sherrod at 512-341-3161 or hsherrod@roundrocktexas.gov. Download the approved Performance Bond Form or Letter of Credit. Cash is not accepted.
- Subdivision Improvement Permit application packet (pdf) updated January 2022
- Letter of Transmittal (pdf) updated May 2018
- Presubmittal Meeting Request Form (pdf) updated May 2022
- Water and Wastewater Availability Request Form (jotform)
- Performance Bond Form for Subdivision Improvements (pdf)
- Fee Payment Form (pdf) Oversize Fee, Regional Detention Fee, Subdivision Inspection Fee
- Roadway Impact Fees
- Atlas 14 Development Scenarios (pdf)
- New – TxDOT ROW Access Permit Application (pdf)
Design References
- Construction Summary Table (pdf)
- Design and Construction Standards (DACS)
- Standard Construction Details
- Pre-Approved Products List (Excel) water, wastewater and drainage products
- Deceleration Lane Design and Presentation Standards (pdf)
- Atlas 14 Development Scenarios (pdf)